A proprietary panel formwork system was used to construct the 3000 mm high circular walls and deck of this water retaining structure.
A high standard of workmanship in the complex reinforcement, formwork and concrete placement was required to meet the exacting standards of the project engineer. A 50/50 blend of GGBS and OPC was used for all concreting works to ensure that correct curing could take place.
Contract: 19m diameter, 750 m³ Capacity Water Attenuation Tank, Selby
Engineer: Eastwood and Partners (Consulting Engineers) Limited
Carried out: July to December 2006